
Here is the new header beam and the temporary supports holding up the next two floors. When they removed the lathe & paster, they found that the studs went right up to the floor joists on the next floor with no support. So this beam - 14 inches high x 4 inches wide had to go in. It had to come into the house via a window as it was too long to come in the door!

0 Comments:
Post a Comment
<< Home